OCI Wyoming


Challenge
The OCI Wyoming mine has the world’s largest and purest deposits of trona: a mixture of sodium carbonate (soda ash), sodium bicarbonate, and water. Sodium carbonate is used widely in industry, including high purity applications such as food (e.g., baking soda) and specialty chemicals.Since 1962 the mine has generated enormous piles of tailings. Subsurface groundwater contaminants from these tailing piles were increasingly seeping into the mine’s settlement pond, increasing refining costs, OCI needed a way to keep the tailings’ subsurface runoff out of the settlement pond. Furthermore, since the mine has at least 50 more years of trona reserves, OCI required a solution that would extend past the mine’s anticipated lifespan.

Project Scope
Barr Engineering determined that a cut-off wall 3,500 feet (1067 m) long, ranging in depths of 17 to 45 feet (5.2 to 13.7m), was required to keep the tailings’ subsurface runoff from reaching the settlement pond. Barr specified a Trench-Cutting- Remix-Deep Wall (TRD) to create a underground, continuous, homogenous, 18-inch (46 cm) wide soil-cement wall. However, the salinity of the surrounding soil will shorten the life of the soil-cement wall.Fortunately, Barr had previously used CMI’s synthetic sheet piling and was familiar with its 50-year plus lifespan. By driving CMI’s weather able rigid vinyl sheets into the middle of the soil-cement filled trench, the resulting hybrid wall would have a lifespan well beyond that of a wall created with just one or the other of its components. In other words, when, after some decades, soil salinity or other elements corrode the OCI Wyoming soil-cement sides of the TRD, the interior PVC sheets will virtually be just beginning their service life.

Construction
Based on Barr’s familiarity — as well as a personal visit by an OCI representative to Crane’s state-of-the-art manufacturing plant — CMI was selected to be the supplier of the synthetic sheet piling.Being the first of its kind, the hybrid wall construction presented a unique challenge to the team: how to allow for long breaks during the cement pour? That is, the sheets could only be inserted into the soil-cement slurry when it was still relatively soft — weekend or days-long service breaks would create an impenetrable barrier at the last sheet installed.
CMI worked closely with Barr’s geotechnical contractor, Hayward Baker, to create a new, patenting-pending solution: the CMI Slurry Void Device. (See next page for SVD details.) CMI designed and built the SVD in just two weeks to meet Hayward Baker’s tight installation schedule.

Performance
OCI has installed groundwater monitors to detect any further migration of contaminated subsurface water from the tailings pile. Preliminary results indicate that the hybrid cut-off wall is containing the pile’s groundwater, making it easier, faster, and less expensive for the mine to refine its trona using the settlement pond.Other Case Studies
-
Elementis Subsurface Barrier Wall
A manufacturing plant owned by Elementis Chromium L.P. became contaminated due to operations at a property owned by El Paso Merchant Energy-Petroleum....
-
Pete’s Harbor
Blu Harbor is a luxury apartment development in Redwood City, California located on a peninsula on San Francisco Bay. The site was once a marina with an old tide “wall” made of asphalt, enormou...
-
Port of Wilmington
Background The Port of Wilmington, an international seaport owned and operated by the North Carolina State Port Authority, is strategically located on the East Coast with easy access to national highw...
-
Bridgeway Acres Slurry Wall Relocation
BackgroundThe Pinellas County Bridgeway Acres (BW A) Landfill includes an area of approximately 705 acres. The entire site is enclosed by a subsurface cut-off wall constructed using traditional slurry...
-
Martin Park Landfill
Background The Martin Park Landfill operated from 1970 until 1974 and closed prior to the enactment of the state regulations that require solid waste disposal site owners and operators to establish a ...
-
Florida Gas Plant Superfund
Background The Plant Site is located in Florida Location, Houghton County, Michigan. Florida Location is part of Calumet Township, Michigan. The Plant Site is a former Manufactured Gas Plant (MGP) pro...